Two-storey custom home designed and built by Begbie Bentham
Our Process

One team, from first sketch to front door.

Seven clear stages, a director you can call, and a fully costed design before you commit to build.

±10%Preliminary quote vs final contract
2–3 monthsDesign, pricing & specification
~2 weeksFrom approval to on site
8–14 monthsTypical build time
Open-plan kitchen and dining in a Begbie Bentham custom home
Design & construct

Your designers and builders, in the same room.

With most builders, you pay an architect for plans and then find out what they cost to build. With us, the people drawing your home sit alongside the people who will build it, so every design decision is priced as it's made.

You'll see your home in 3D and walk through it live during design, so you know exactly how it will look and feel. Can't read plans? You won't need to.

And you'll deal directly with Adam or James, from your first meeting to the day you get the keys.

The 7 stages

What happens, and when.

Every home is different, but the path is always the same. Here's what to expect at each stage.

  1. 1
    Week 1

    Discovery Meeting

    Sit down with Adam or James at our Stones Corner studio, on your block, or by video. We'll talk through your brief, your block and your budget, and give you a realistic budget range before any design work begins.

    There's no cost and no obligation. Bring your wishlist, photos you love, and any questions.

  2. 2
    Design & pricing

    Concept Design & Budget Estimate

    We assess your site, including slope, soil, access and approvals, then our in-house designers develop concepts around how you want to live.

    • 3D modelling and live walkthroughs, with changes made in real time
    • A budget estimate listing every inclusion, so you can see where the money goes
    • We adjust the plan or specification until you're happy with the estimate
  3. 3
    Design & pricing

    Preliminary Design & Building Quote

    We bring in the engineers, consultants and suppliers, refine the design into detailed drawings and a full specification, and prepare your building quote.

    Your preliminary quote comes with our guarantee: it will be within 10% of your final contract price. Stages 2 and 3 together usually take two to three months.

  4. 4
    Before we build

    Contracts & Building Approvals

    You sign a fixed-price building contract prepared from your final plans and specification, so you know exactly what you're getting and what it costs.

    • We handle permits and approvals with council and certifiers
    • Knockdown rebuild? We can arrange demolition of your existing home, or you can do it yourself
  5. 5
    Usually 8–14 months

    Construction & Interior Fit Out

    Once approval comes through, we're usually on site within two weeks preparing for footings and slab.

    • Track progress, selections and payments 24/7 in your online project portal, and message our team directly
    • Regular site visits with our design and building teams
    • Choose any quality tap, tile or appliance, with help from our interior designer and suppliers
    • Pools, driveways, retaining walls, security and blinds can all be included
  6. 6
    The big day

    Handover & Completion

    Before you move in, we carry out a thorough quality inspection and walk you through your finished home. Then we hand over the keys.

  7. 7
    After you move in

    Service & Warranties

    Your home is covered by the QBCC Home Warranty Scheme, and we're still here after handover for any support you need.

At every stage

No surprises. No chasing. No guesswork.

A director you can call

You'll deal directly with Adam or James, not a sales team or a call centre.

Costs you can see

Estimates list every inclusion, and your preliminary quote is guaranteed to within 10% of the final contract.

Progress you can track

Your online project portal shows progress, selections and payments whenever you want to check in.

In our clients' words
“They come up with a quote to start with that they guarantee is going to be plus or minus 10 of the final figure… there was actually less than one percent variation.”
Janine & Pete · Camp Hill
Questions

Building FAQs

How long before we can start building?

Designing and pricing your home brings together many consultants and suppliers, and usually takes two to three months depending on complexity. At the end you'll have a detailed plan, specification and price to build.

How quickly can you start once we have approval?

Once we receive building approval, we're usually on site within two weeks preparing for footings and slab.

How long does the build take?

Most homes take between 8 and 14 months, depending on site conditions, size and the complexity of the design.

How will I be kept informed during the build?

Our online project management system lets you see progress, review your selections, check remaining payments and message our team at any time. You'll also have regular site visits with our design and building teams.

Can I make changes once construction has started?

Some changes can be accommodated, but it's best to finalise the design before construction begins to avoid delays and extra costs. That's why we spend the time getting the design right up front.

Start with stage one

Book your Discovery Meeting.

Tell us a little about your plans. Begbie Bentham will call you within one business day to arrange a time, at our Stones Corner studio, on your block, or by video.

Prefer to talk? Call (07) 3899 2500
or email info@begbiebentham.com.au